EXASCALE DATA CENTER ECOSYSTEMS AT UNPARALLELED LOW PRICING
The Core Campus located in Las Vegas, Nevada, will have a capacity of up to 3.5 million square feet of data center space and up to 430 MW of power upon completion. Switch’s Tier 5® Platinum facilities, combined with exascale purchasing power, makes Switch the highest-rated and most cost-effective colocation environment in the industry.
100% GREEN POWER
- 4.9¢ per kWh, 100% green power
- 100% power uptime guarantee
- Up to 55kW per cabinet
LOW OR NO TAXES
- 2% sales and use tax in Nevada
- 75% reduction in personal property tax in Nevada
- No personal state income tax in Nevada
35-60% SAVINGS ON CONNECTIVITY
- 5ms to Los Angeles
- Dedicated 7ms fiber to Switch’s Citadel Campus via the Switch SUPERLOOP®
- 50+ carriers leveraged by Switch CONNECT® telecom auditing and purchasing cooperative
- Services include: MPLS, IP, Transport, SIP and SD-WAN (Circuits do not have to terminate at Switch)