The World’s Largest, Most Advanced Data Center Campus

The Citadel Campus is Switch’s response to the growing demand for Internet-connected people, devices and services. It is designed to be the world’s largest data center campus built on the same designs of the industry-leading Core Campus in Las Vegas, Nevada. Connected by a dedicated sub-7ms fiber network, The Citadel Campus and The Core Campus form the world’s largest active-active data center ecosystem on the planet.

  • Largest, most advanced data center campus on the planet
  • Up to 7.2 million sqft on 2,000 acres of land in northern Nevada
  • Up to 650 MW of power at volume price of 4.9 cents per kWh
  • 2% sales and use tax
  • Up to 75% reduction on personal property tax
  • 100% renewable energy used to power the facilities
  • Connected to California, via Switch SUPERLOOP®
  • Connected to the world’s largest technology collaboration ecosystem
Switch TAHOE RENO 1 Data Center — The Citadel Campus, Tahoe Reno, Nevada, USA
The Citadel Campus
Sq. Ft. MW Status
TAHOE RENO 1 1,427,986 Sq. Ft. Up to 130
TAHOE RENO 2 532,938 Sq. Ft. Up to 60
TAHOE RENO 3 621,292 Sq. Ft. Up to 80
TAHOE RENO 4 937,200 Sq. Ft. Up to 80
TAHOE RENO 5 937,200 Sq. Ft. Up to 80
TAHOE RENO 6 937,200 Sq. Ft. Up to 80
TAHOE RENO 7 937,200 Sq. Ft. Up to 80
TAHOE RENO 8 621,292 Sq. Ft. Up to 60
TOTALS 6,952,308 Sq. Ft. Up to 650 MW Open Construction Planned