We can beat any data center’s colocation price guaranteed. Contact our Austin data center experts today!
+1-702-602-7048

THE FIFTH PRIME THE ROCK | Switch HOUSTON
Switch’s Fifth Prime Data Center campus called The Rock has locations in both Austin and Houston, Texas. The Houston campus has one existing data center with the ability to support 18 MW of customer power at full buildout. Switch intends to commence development on new data centers in both Austin and Houston at the end of 2021, with the first sectors available for customer deployments in 2023. Switch’s Tier 5® Platinum exascale data center facilities make Switch the highest-rated and most cost-effective colocation environment in the industry.
100% GREEN POWER
- Switch data centers are powered by 100% renewable energy enabling industry-leading ESG compliance
- High density up to 50kW per cabinet
- 100% power uptime guarantee

SECURED LOCATION
- Military-trained physical security
- 24x7x365 security presence
- Located in a region with low incidence of natural disasters
- Independent power grid
- Wind rating of 185 MPH

LOW LATENCY
- Covers central latency zone
- 4.4ms to Dallas, 3.1ms to Houston, 1.5ms to San Antonio
- Public, private, hybrid, and multi-cloud options available

CONNECTIVITY SAVINGS
- Save up to 35-60% on connectivity savings through a telecom audit
- The world’s most powerful telecom purchasing cooperative
- Services include: MPLS, IP, Transport, SIP, and SD-WAN