ATLANTA EXASCALE DATA CENTER ECOSYSTEMS
The Keep Campus located in Atlanta, Georgia, will have up to 150 MW of power and a 2,000+ acre expansion campus of multi-gigawatt capacity, upon completion. Switch’s Tier 5® Platinum exascale data center facilities make Switch the highest-rated and most cost-effective colocation environment in the industry.
Switch ATLANTA KEEP 2.0 Construction Flyover Video
100% GREEN
POWER
- 100% renewable energy enabling industry-leading ESG compliance
- Up to 2MW per cabinet
- 100% power uptime guarantee
LOW OR NO
TAXES
- 0% sales and use tax in Georgia
- Modernized data center tax policy made possible by “The Switch Bill”
LOW
LATENCY
- Covers southeastern latency zone
- Services include: MPLS, IP, Transport, SIP & SD-WAN (Circuits do not have to terminate at Switch)
CONNECTIVITY
SAVINGS
- Save up to 35-60% on connectivity savings through a telecom audit
- The world’s most powerful telecom purchasing cooperative