MENU

The World’s Largest, Most Advanced Data Center Campus

The Citadel Campus is Switch’s response to the growing demand for Internet-connected people, devices and services. It is designed to be the world’s largest data center campus built on the same designs of the industry-leading Core Campus in Las Vegas, Nevada. Connected by a dedicated sub-8ms fiber network, The Citadel Campus and The Core Campus form the world’s largest active-active data center ecosystem on the planet.

  • Largest, most advanced data center campus on the planet
  • Up to 7.2 million sqft on 2,000 acres of land in northern Nevada
  • Up to 650 MW of power at volume price of 4.9 cents per kWh
  • 2% sales and use tax
  • Up to 75% reduction on personal property tax
  • 100% renewable energy used to power the facilities
  • Connected to California, via Switch SUPERLOOP
  • Connected to the world’s largest technology collaboration ecosystem
Switch TAHOE RENO 1 Data Center — The Citadel Campus, Tahoe Reno, Nevada, USA
TAHOE RENO, NEVADA
The Citadel Campus
Sq. Ft. MW Status
TAHOE RENO 1 1,427,986 Sq. Ft. Up to 130
TAHOE RENO 2 532,938 Sq. Ft. Up to 60
TAHOE RENO 3 621,292 Sq. Ft. Up to 80
TAHOE RENO 4 937,200 Sq. Ft. Up to 80
TAHOE RENO 5 937,200 Sq. Ft. Up to 80
TAHOE RENO 6 937,200 Sq. Ft. Up to 80
TAHOE RENO 7 937,200 Sq. Ft. Up to 80
TAHOE RENO 8 621,292 Sq. Ft. Up to 60
TOTALS 6,952,308 Sq. Ft. Up to 650 MW Open Construction Planned
Switch TAHOE RENO

Switch

The World's Leading Data Center Ecosystem Switch
Las Vegas Nevada 89118